Contact Info
Contact Information
Our Location
84, Anand Nagar, Raipur, Chhattisgarh
Phone Number
Email Address
Get In Touch
Get in Touch with Sadbhav Renewable
Faqs
Frequently Asked Questions
How Much Roof Area Do I Need For A Solar Pv System Installation ?
Do I Need To Have South Facing Exposure To Have A Solar Energy System ?
Should The Exposure Be Completely Free Of Trees Or Buildings That Could Shade The Panels Or Drop Debris On Them ?
What Is The Size Of Solar Pv Domestic And Commercial Plants ?
How Many Units Of Energy Are Generated From A 5 Kw Solar Pv System?
Will My System Work At Night ?
At night, you continue to draw power from your utility. Sunlight must be present for your solar modules to produce power.
Will My System Work On Cloudy Days?
How Long Is The Solar System Expected To Function Properly ?
The solar system typically lasts for 25 years.
How Will I Know If The System Is Working ?
Today nearly all inverters come with built-in monitoring that varies based on manufacturer. By reconciling your production with your electric bill, you can get a good idea what your household’s electric load is and how much of a difference the photovoltaic system is making.
Is A Battery Backup Recommended For My Solar Panels System ?
Will I Need Certifications/permissions From External Authorities To Install Solar Panels On My Roof ?
What Happens During A Power Outage ?
There are 3 possibilities depending on the type of system you have installed:
Hybrid Plant: This will synchronize with the Backup power system (DG set, Power Inverter) and continue to provide youSolarelectricity
Grid-Tied: This will provide power during daylight hours but will not provide power in an outage to ensure the safety of the people working on the grid
Off Grid: This will provide power during daylight hours and has a battery backup designed to provide power to critical loads during an outage, day or night.
What Is Net Metering & How Does It Work ?
The area required by a rooftop PV plant depends on the extent of shade-free space available and solar panel efficiency. Approximately 100 sq.ft of roof space is required for 1 kW of solar of capacity at current crystalline panel efficiency levels.
Can Accelerated Depreciation Benefits Be Claimed By Solar Power Developers ?
Net metering is a method by which solar PV plant owners can be compensated for any excess solar power that they supply to the grid. The conventional uni-directional electricity meter is replaced with a bidirectional meter that spins in reverse for energy that is supplied to the grid. The consumer is billed by the utility only on the net energy consumption indicated by the meter.